One of the first questions Dublin homeowners ask us is how long the whole process takes β from first enquiry to finished room. The honest answer depends on the type of conversion, but here's a full breakdown.
Timeline by Conversion Type
| Conversion Type | Typical Duration |
|---|---|
| Velux / Rooflight | 3 β 5 weeks |
| Rear Dormer | 6 β 10 weeks |
| Hip-to-Gable | 8 β 12 weeks |
| Mansard | 12 β 16 weeks |
The Full Process: Step by Step
π‘ The roof is opened and made weathertight within 2β3 days. You won't be left with an exposed roof overnight.
What Can Delay an Attic Conversion?
- Planning permission (adds 8β12 weeks if required)
- Protected structure status β additional assessments needed
- Unexpected structural issues discovered on site
- Bad weather during roof opening phase
- En-suite requiring rerouting of existing plumbing
Can I Stay in the House During the Work?
Yes β in almost all cases. The work is carried out from above and through the attic hatch. The main disruption is the staircase installation, which typically takes 1β2 days. Most Dublin families stay in the house throughout the entire conversion.